243 meters SaniTube DN100 with 4 couplings for Elektrizitätswerk des Bezirks Schwyz AG

By Bold Apps

243 meters SaniTube DN100 with 4 couplings for Elektrizitätswerk des Bezirks Schwyz AG

In the power plant of Wernisberg, they noticed during the regular check up a leak in the cool water pipeline. Within 3 days we could finish rehabilitating this pipe. But during work, the installers had a few obstacles to face like, the job site was very hard to access, because the starting place was on a mountain and it ended in the power plant building. In the building, the job site was in the turbine room, which means it was very loud and the installers had to wear a protective headphone. The installer loved this job, because it was diverse to work in a power plant and they could also see new things such as huge pipes with huge pusher ( Schieber ).

Customer Elektrizitätswerk des Bezirks Schwyz
Country Switzerland
Installation date 2017
Products SaniTube
    DN
    • 100
    Application area Other
    Use case Power Plant
    Pipe material Steel
    Number of seals N/A
    Track length 243
    Operating pressure 7

     